ST Micro

WMC 2019
Barcelona

01 Project

Exhibtion: MWC 2018 in Barcelona is the world’s largest exhibition for the mobile industry, incorporating a thought-leadership conference that features prominent executives representing mobile operators, device manufacturers, technology providers, vendors and content owners from across the world.

...

Exhibtion: MWC 2018 in Barcelona is the world’s largest exhibition for the mobile industry, incorporating a thought-leadership conference that features prominent executives representing mobile operators, device manufacturers, technology providers, vendors and content owners from across the world.

Exhibitor: STMicroelectronics is a world leader in providing the semiconductor solutions that make a positive contribution to people’s lives, today and into the future.

Project Manager: Nicola Styczyńska&Anna Musiał-Kolasińska

Technical Manager: Adam Beim

Size: 181 m²

Design and project management agency: Evolve Creative Solutions

see more slide up

02 Challenge

Each double-deck stand requires our full involvement and undivided attention at every stage, including the logistics and transportation. We must always respect the loading rules: first go particle boards and plywoods and then steel elements.
Ready to go...

Each double-deck stand requires our full involvement and undivided attention at every stage, including the logistics and transportation. We must always respect the loading rules: first go particle boards and plywoods and then steel elements.
Ready to go ?

see more slide up

03 Execution

In order to build the STMicro stand, we used 6-meter long steel elements, which were very heavy due to their length but at the same time simply irreplaceable – they were key for the construction. We loaded 4 full trucks – 7 people were needed to load each truck and it took them over 5 hours as the...

In order to build the STMicro stand, we used 6-meter long steel elements, which were very heavy due to their length but at the same time simply irreplaceable – they were key for the construction. We loaded 4 full trucks – 7 people were needed to load each truck and it took them over 5 hours as the loading process was mainly manual.

As a stand constructor working for Evolve Creative Solutions we built 181m2 stand for STMicro.

It was a pleasure to work together during this project!

see more slide up

STMicro

Barcelona WMC 2018 181 m²

STMicro

Barcelona WMC 2018 181 m²

STMicro

Barcelona WMC 2018 181 m²

STMicro

Barcelona WMC 2018 181 m²

STMicro

Barcelona WMC 2018 181 m²

STMicro

Barcelona WMC 2018 181 m²

TREND.
expo

How should you prepare for the trade fair? How to create an exhibition stand that attracts attention? When should you start preparing for the trade fair? What are the trends in the exhibition stand design?

We can provide you with some useful pieces of advice, tips and suggestions on prevailing trends we identify in design.

Set the route