Exhibtion: MWC 2018 in Barcelona is the world’s largest exhibition for the mobile industry, incorporating a thought-leadership conference that features prominent executives representing mobile operators, device manufacturers, technology providers, vendors and content owners from across the world.
...Exhibtion: MWC 2018 in Barcelona is the world’s largest exhibition for the mobile industry, incorporating a thought-leadership conference that features prominent executives representing mobile operators, device manufacturers, technology providers, vendors and content owners from across the world.
Exhibitor: STMicroelectronics is a world leader in providing the semiconductor solutions that make a positive contribution to people’s lives, today and into the future.
Project Manager: Nicola Styczyńska&Anna Musiał-Kolasińska
Technical Manager: Adam Beim
Size: 181 m²
Design and project management agency: Evolve Creative Solutions
Each double-deck stand requires our full involvement and undivided attention at every stage, including the logistics and transportation. We must always respect the loading rules: first go particle boards and plywoods and then steel elements.
Ready to go...
Each double-deck stand requires our full involvement and undivided attention at every stage, including the logistics and transportation. We must always respect the loading rules: first go particle boards and plywoods and then steel elements.
Ready to go ?
In order to build the STMicro stand, we used 6-meter long steel elements, which were very heavy due to their length but at the same time simply irreplaceable – they were key for the construction. We loaded 4 full trucks – 7 people were needed to load each truck and it took them over 5 hours as the...
In order to build the STMicro stand, we used 6-meter long steel elements, which were very heavy due to their length but at the same time simply irreplaceable – they were key for the construction. We loaded 4 full trucks – 7 people were needed to load each truck and it took them over 5 hours as the loading process was mainly manual.
As a stand constructor working for Evolve Creative Solutions we built 181m2 stand for STMicro.
It was a pleasure to work together during this project!